ABB took on a critical project to improve the safety and reliability of the high-power rectifier local control panels operating at the aluminium smelter in NSW.
Campbell’s Australia was sceptical that new motor technology could deliver big energy savings at a factory in Shepparton. The proof was in the power bill.